Forward-looking operational intelligence built from actual APG evidence, future booking demand, recent site behaviour and transparent forecast rules. Forecasts support decisions; they do not replace programme, commercial or safety controls.
Whole-site workforce forecast built only from innDex / turnstile attendance. APG Labour and DABS are deliberately not substituted for project workforce.
Loading turnstile evidence…
Uses physical Headcount evidence to learn level concentration, then reconciles it with the whole-site turnstile workforce forecast. APG keeps an explicit unlocated reserve rather than pretending every forecast person can be assigned to a floor.
Forecast people by level from observed spatial behaviour.
How much of the predicted workforce APG expects to be physically locatable from Headcount behaviour.
Where the most frequently observed companies have historically concentrated.
Physical Headcount coverage is scored separately from whole-site workforce confidence.
Operational programme proxies derived from workfaces, incoming materials, vertical logistics demand, labour pressure and delivery clustering.
Potential programme exposure is a calculated planning proxy, not a contractual delay assessment.
Forecasts combine weekday behaviour, recent trend, upcoming booked materials and actual site demand patterns.
Forecasts use measured Hoist journeys to predict both movement TO each level and movement FROM each level, alongside journey duration and load behaviour. Journey P50 and P80 remain separate.
Forecasts use historic weekday volumes and actual arrival-time behaviour to show roughly how many vehicles are expected each day, when they are most likely to arrive, and their predicted booked, not-booked, early, late and dwell behaviour.
Uses the latest hourly counted set per level for each historical day, then applies weekday behaviour and a small, transparent incoming-material pressure adjustment. No extra data request is required.
Operational risk and evidence confidence are separate. High workforce or Hoist use is treated as pressure, not failure. Missing evidence cannot inflate a company to 100.
Compact comparison of the same company evidence. Open only when you need to scan the whole list.
The highest-value actions from predicted workforce, deliveries, Hoist demand, level pressure, Waste and Crane interaction.
Workforce, Delivery, Hoist, material readiness, interface pressure and constraints are scored separately before being combined.
Uses booked-delivery descriptions, explicit destination clues and recent company destination patterns. Inferred destinations are clearly labelled.
Fast scenario model for anticipated deliveries, Hoist movements, peak labour and logistics management demand. This is a benchmark model, not a contractual estimate.
Model scales observed LSE logistics intensity by floor area, vertical complexity, duration and programme-intensity factors. Use it to challenge assumptions and size the logistics strategy, then validate against the tender programme.
The module separates ACTUAL evidence, DERIVED metrics and FORECAST outputs. Confidence falls where evidence coverage is thin.